We'll use these to plan an manage our timelines and deliverables. As our plans update, so will these links:
* Full project report
* Link to Gantt Chart
Tasks and milestones are grouped into roughly 9 phases:
1) Logistics
2) Part Design, Project Planning
3) Mold Design
4) Mold Rework + Manufacturing
5) Process Optimization
6) Production Run
7) Assembly
8) QA/QC Analysis
9) Post project reflection
Each phase has three large action groups that correspond to the 3 large component groupings of our yoyo. Each component group gets consistent coverage from teammates to minimize need for extensive knowledge transfer :
* Body parts - These injection molded plastic pieces make up the foundation of our Yoyo.
* Spinner parts - These are smaller injection molded pieces that are inserted into the body of the Yoyo.
* Window parts - These are thermoformed plastic pieces that fit together with the body and allow users to see the spinner in action.
Will and Lesley will work on the Body parts, with Will leaning a little more on SolidWorks and Lesley leaning a little more in CAM
Chris and Eric will work on the Spinner parts, with Eric leading more CAM work and Chris taking on more SolidWorks work.
Lucien will lead the thermoformed parts, with Eric and Chris assisting as needed. Since the thermoformed parts are the simplest, it makes sense to have Lucien grab resources as needed and plan on having two people on each of the other parts.
Production and Assembly time shots in the dark at this point, but as we collect data on which tasks took longer than expected, we'll be able to improve visibility and granularity into predictions for how long future tasks will take.
China mold company